July 14, 2022
BY Koch Engineered Solutions
Koch Engineered Solutions announces that its affiliate company, Optimized Process Designs, has executed a definitive engineering, procurement, and construction (EPC) agreement with Fidelis New Energy LLC for the primary renewable fuels processing facility (the Grön Facility) as well as the related infrastructure required to support the GigaSystem carbon negative renewable fuels facility. The multi-billion-dollar Grön Facility involved substantial design and engineering work to support a definitive EPC agreement with price and schedule certainty as well as performance guarantees that allow for non-recourse project financing.
The GigaSystem has been designed from the ground up to utilize carbon capture and sequestration (CCS) with carbon negative power (CNP), enabling the production of carbon negative renewable fuels, all while using proven technologies. Situated strategically at the crossroads of agricultural trade routes and traditional fuels production at the Port of Greater Baton Rouge, Fidelis expects the GigaSystem will be the first dispatch renewable fuels facility globally due to its energy efficient design, CCS, and CNP. The GigaSystem site is unparalleled for feedstock supply and renewable fuels delivery globally via rail, water, road, and refined product pipelines. To optimize the use of this logistical advantage, the facility will include industry leading feedstock processing capabilities across all feedstock types, including emerging feedstocks. One unique advantage of the facility is its inherent design to produce from its renewable co-products the equivalent of over 1,000 megawatts of electrolyzer-generated hydrogen, creating a clear pathway to creating carbon negative renewable fuels when combined with CCS and CNP.
Advertisement
"OPD is excited to be moving forward with the Fidelis team on this world class renewable fuels project. Our speed to market and turn-key approach to engineering, procurement, and construction will continue to add significant value to the project," said Brian Boster, president of Optimized Process Designs. "As part of Koch Engineered Solutions, we are well positioned to partner on this large-scale facility and look forward to full a notice to proceed following Fidelis reaching its final investment decision."
Dan Shapiro, Fidelis co-founder, CEO and managing partner said, "Today's milestone of executing the definitive EPC agreement for the Grön Fuels Facility, the cornerstone of the GigaSystem, represents a tremendous effort by Koch OPD, the Fidelis Project Management Office, and many other strategic partners. This milestone is a major step towards the initial strategic objective for the GigaSystem: the production of carbon negative fuels through an on-purpose greenfield production facility."
Advertisement
Bengt Jarlsjo, Fidelis co-founder, partner, and president added, "OPD truly lived up to their name 'Optimized Process Designs' by working collaboratively with Fidelis PMO to implement the Fidelis RACER framework to fully optimize energy efficiency, reduce carbon intensity, and maximize the circularity of the facility. For example, the Fidelis PMO worked closely with OPD to maximize the use of steam generated by waste heat capture for emissions-free power generation and incorporated a renewable natural gas production facility that will use the liquid byproducts of Grön Fuels' highly flexible pretreatment system to produce biogas. We are proud of the progress made by the combined Fidelis/OPD team and look forward to continued success as the project moves forward, and we look forward to creating thousands of direct and indirect jobs as a result of constructing and operating the facility."
The Michigan Advanced Biofuels Coalition and Green Marine are partnering to accelerating adoption of sustainable biofuels to improve air quality and reduce GHG emissions in Michigan and across the Great Lakes and St. Lawrence Seaway.
The U.S. Energy Information Administration reduced its 2025 forecasts for renewable diesel and biodiesel in its latest Short-Term Energy Outlook, released April 10. The outlook for “other biofuel” production, which includes SAF, was raised.
FutureFuel Corp. on March 26 announced the restart of its 59 MMgy biodiesel plant in Batesville, Arkansas. The company’s annual report, released April 4, indicates biodiesel production was down 24% last year when compared to 2023.
Neste has started producing SAF at its renewable products refinery in Rotterdam. The refinery has been modified to enable Neste to produce up to 500,000 tons of SAF per year. Neste’s global SAF production capacity is now 1.5 million tons.
Tidewater Renewables Ltd. has reported that its biorefinery in Prince George, British Columbia, operated at 88% capacity last year. A final investment decision on the company’s proposed SAF project is expected by year end.